Marbella tenders a six million euro machinery contract to remove invasive algae and maintain its beaches
The new contract, which will replace the one in force since 2024, includes heavy and light vehicles and specialist equipment with drivers. Bids may be submitted until 27 November and the service will also cover watercourses, public plots and emergencies.
Translated from the Spanish original. Leer en español
Marbella town hall has opened the tender for the rental of machinery and special vehicles with drivers, a contract designed to strengthen the removal of invasive algae and the maintenance of beaches across the municipality. The tender has a base budget of six million euros, including VAT, and bids may be submitted until 27 November 2026, according to the council note published on 4 November.
The file was already on the Public Sector Procurement Platform before the announcement. Informa Málaga reported on 31 October that the base budget was 4,958,677.68 euros excluding VAT, under file SE 10/27, through an open procedure, with bids due by 27 November at 23.59. That pre tax figure is the one which, once VAT is applied, gives the six million euros announced by the council, so both sources describe the same contract.
it expands the provision of equipment and the council operational capacity in the face of a problem that is increasingly relevant on the coastline
Diego López, councillor for the area, on the new contract, which will replace the one in force since 2024
A species that arrives with the currents
The councillor for the area, Diego López, noted that algae arrivals depend on the currents and the state of the sea, so the right equipment must be available to act quickly once it reaches the shore. In the same note he said that in recent years episodes of accumulation of the invasive exotic species Rugulopteryx okamurae on the coastline have become more frequent and more intense.
The contract will include heavy and light vehicles, industrial vehicles and specialist equipment that can be mobilised according to the needs of each operation. The aim is to speed up cleaning, removal, loading and transport of the material collected, and to respond to extraordinary episodes or situations requiring immediate action. López said the priority is to reduce the impact of these strandings on the beaches, guarantee public health and preserve the image of a space that is fundamental for the city, and he praised the daily work of the council crews.
Also for watercourses, plots and emergencies
The scope is not limited to the sand. The council note states that the machinery and special vehicles may also be used to clean riverbeds and streams and on undeveloped public plots, so that the council has greater capacity to respond to emergencies and accumulations of waste. In the councillor words, the aim is to plan ahead, organise resources and ensure Marbella has sufficient means to meet the needs of its beaches and natural spaces throughout the year.
The workload the contract must absorb was already measured this summer. In her review of the beach season, the mayor put the algae removed so far that summer at 1,300 tonnes and investment in beach maintenance and lifeguard services at 1.3 million euros, with the algae collected and stockpiled for later transfer to landfill.


